Standardised inspection windows and field procedures designed around operational facility constraints and industrial power requirements.
SMETS2 Meter Installation
Telemetry Diagnostic Inspection
High-Voltage Supply Audit
Upgrade legacy fiscal metering units to automated half-hourly smart infrastructure with live consumption telemetry and verified data communications.
Comprehensive signal audits, data logger calibration, and pulse unit testing to resolve automated transmission interruptions on commercial supply lines.
Full technical evaluation of substation connections, transformer enclosures, and main switchgear capacity before substantial site load expansions.
Site preparation checklist
Verify Meter Clearance
Isolate Secondary Loads
Assign Responsible Escort
Receive Hand-Over Sheet
Ensure unrestricted physical access to intake cupboards, plant rooms, and distribution boards with at least one metre of perimeter clearance.
Coordinate shutdown sequences for non-critical machinery and IT peripherals prior to the brief isolations required during exchange protocols.
Sign the completed commissioning certificate, verify initial meter indexing, and store the digital calibration logs sent directly to your account.
Designate a competent facilities supervisor to grant plant room entry, confirm security passes, and brief the technician on local hazards.
Reserve your engineer appointment
Select your preferred date window and register site access requirements through our direct scheduling desk to guarantee technician dispatch.


